
Richmond St. Condo Renovation
A three-month condo renovation with an open kitchen, relocated laundry, heated flooring and a reconfigured bathroom.
Explore the project- Location
- Toronto
- Duration
- 3 months
- Property
- Condominium
- Focus
- Layout + storage
Making more of the existing space.
Interior wall removal opened the kitchen and living area. Moving the laundry and converting a closet into a bathtub-and-shower area changed how the condo could be used.
Storage that belongs to the layout
Custom cabinetry fits the kitchen and closets, with pull-out shelves keeping frequently used items accessible.
A bathroom with room for both
A former closet became space for a combined bathtub and shower area. The wider scope included a complete bathroom renovation, French white oak flooring, heated floors and renewed trim.
A continuous interior
The kitchen, circulation spaces and fitted storage share a coordinated material palette.

The complete project gallery.
Explore the rooms, details and project views. Select an image to enlarge it.
16 images
















Planning a similar project? Explore our full-home renovation services.
See our processLet’s talk about your space.
Bring us your kitchen or condo renovation plans.





